# 10.5 Project settings

Project settings define general information and energy contract parameters:

* **Project details** – set project name, address, city, postal code and country. The **show non-measured.**
* **Grid settings** – choose the main meter, connection type (single or three‑phase) and define import/export capacity limits and safety margins.
* **Energy contract** – configure consumption scaling factor, consumption cost, distribution cost, injection scaling factor, injection cost and grid fee. These parameters influence curtailment and EMS decisions.
* **Standard working mode**– set default operating modes for the battery and solar energy (e.g., *Self* for self‑consumption).

Changes on this page must be saved using the **Opslaan** button at the bottom.


---

# Agent Instructions: Querying This Documentation

If you need additional information that is not directly available in this page, you can query the documentation dynamically by asking a question.

Perform an HTTP GET request on the current page URL with the `ask` query parameter:

```
GET https://docs.voltmasters.io/documentation/voltmasters-platform-overview/10.-project-settings/10.5-project-settings.md?ask=<question>
```

The question should be specific, self-contained, and written in natural language.
The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
