The DSO RTU dashboard shows, in real time, how the grid operator is currently constraining your installation through its Remote Terminal Unit, and lists every command the RTU has sent.
The DSO RTU page (Monitoring → DSO RTU) shows the latest constraint snapshot the grid operator's Remote Terminal Unit (RTU) is applying to your installation, and below it the history of every signal the RTU sent.
The live snapshot
Restriction banner: tells you whether the RTU is currently constraining the site. It is red while an emergency stop is active, orange when a setpoint is below 100 % or a reason code other than normal applies, and green when there is no active restriction. It also shows when the snapshot was last updated.
Status & mode: the reactive-power (Q) control mode (local curve, or one of the remote modes) and whether an emergency stop is active for production (injection) and for consumption (offtake).
Active setpoints: the limits currently imposed by the RTU, as a percentage of their base. 100 % means no limitation.
Max installation production and Max installation consumption: the caps on the registered assets, relative to the reference powers the operator registered.
Max grid injection (NKP) and Max grid offtake (NKP): the caps at the grid connection point, relative to the contractual access powers.
PV production setpoint and Battery production setpoint: per-type caps, only for operators that steer production types separately. A dash means the RTU sends none.
Min reactive power (Q) and Max reactive power (Q): the reactive-power band, relevant in the remote Q modes.
Reason active power (P) and Reason reactive power (Q): why the operator steers: Normal, Congestion or Test.

RTU history
The RTU history table lists what the RTU sent, newest first:
Time
When the controller recorded the state.
Type
Change when a setpoint, stop or mode changed; Heartbeat for the periodic row written while nothing changed.
Status
Restricted when any setpoint was below 100 % or a stop was active, otherwise No restriction.
Emergency stop
None, Production, Consumption, or both.
Max production, Max consumption
The asset caps in force.
PV setpoint, Battery setpoint
The per-type caps, for operators that use them.
Q mode
The reactive control mode in force.
Use the Filters to show Changes only (every command, without the heartbeats) or Restrictions only. The date range defaults to the last seven days and can cover at most 31 days.
During a certification the history is the log of the inspector's commands, and the snapshot shows what is in force right now. Commissioning and certification explains what to check per test step.